Pattern #11, Colorwork Jacket
Photo on pages 50, instructions begin on page 78.
Updated: 15Apr2015
When chart 1 is complete, before beg chart 2, work as foll:
Pattern #13, Drop-Shoulder Hoodie
Photo on pages 52, instructions begin on page 80.
Updated: 26May2015
Correction is underlined.
The chart key is reversed. Light gray boxes should be worked in Black (B) and white boxes should be worked in Light Gray (A). A revised key is posted here.
Just before Beg chart 1, line should read:
Work 6 rows MC, 2 rows C, 2 rows A, 2 rows B.
Click here to download the revised chart key. [PDF 20KB]
Pattern #16, Double Knit Stole
Photo on pages 56 and 57, instructions begin on page 84.
Updated: 8Jan2016
Click to download corrected chart. [PDF 35KB]
Pattern #17, Vertically Stranded Socks
Photo on pages 58 and 50, instructions begin on page 84.
Updated: 12Mar2015
For a clarification and photos of the Vertically Stranded Colorwork technique, go to: http://lorileebeltman.com/corrections/
Pattern #19, Ikat Pullover
Photo on page 61, instructions begin on page 87.
Updated: 25Jan2016
Corrections are underlined.
Back Yoke
With RS facing, smaller needle and B, pick up and k…
Sleeve Caps
With RS facing, smaller needle and B, pick up and k…
Pattern #20, Kimono-Sleeve Top
Photo on page 62, instructions begin on page 89.
Updated: 15Apr2015
Corrections are underlined.
Left Back Sleeve Shaping
Next row (WS) Cast on 5 (6, 7) sts, knit to end—28 (32, 36) sts.
Right Back Sleeve Shaping
Next row (RS) Cast on 5 (6, 7) sts, purl to end—28 (32, 36) sts.