Holiday 2012

Pattern #1, High Neck Peplum Pullover

Photo on pages 48 and 49, instructions begin on page 80.
Updated: 31Jan2013

1. The stitch key for chart 2 was omitted download chart [PDF 21KB]

2. SLEEVES
Corrections are underlined.
With smaller needles, cast on 60 sts using tubular cast-on method. Change to larger needles.
Set up row (RS) [P2, k1] 4 times, [p2, work row 1 of chart 1 over 6 sts, p3, work row 1 of chart 1 over 6 sts ] twice, [p2, k1] 4 times, p2.
Row 2 K2, [p1, k2] 4 times, [work row 2 of chart 1, k3, work row 2 of chart 1, k2] twice, [p1, k2] 4 times.
Cont in this way, working 4-row trim rep of chart 1 only until piece measures 2½”/6.5cm from beg.
Beg chart 2
Note The full 14-row rep of chart 1 will now be worked. Work chart 2 for sleeve as foll: work rows 37–74, then rows 3–74, then row 3 to end.
Set-up row (RS) P14, work chart 1 over 6 sts, p1, work row 37 of chart 2 over 18 sts, p1, work chart 1 over 6 sts, p14.
Next row (WS) K14, work in chart pats as established over center 34 sts, k14.

Cont as directed to final bind off:

Bind off rem 32 (32, 30, 30) sts.

Pattern #4, Cabled Peplum Pullover

Photo on page 52, instructions begin on page 83.
Updated: 08Jan2018

In Chart 4 Row 2 (WS) should be P2. (The M should be deleted)

Corrections to the peplum begin after Beg charts with the 4th dec row (chart row 15) and are underlined.

Next (dec) row (RS) Rib to marker, sm, work row 15 of chart 1, rib 2, p2tog, *rib 5, p2tog; rep from * once more, rib to chart 2 sts, work row 15 of chart 2, rib 6, p2tog; **rib 5, p2tog, rep from ** once more, work to end—6 sts dec’d. Work 3 rows in pat.
Next (dec) row (RS) Rib to marker, sm, work row 19 of chart 1, k1, p2tog, [rib 4, p2tog] twice, rib to chart 2 sts, work row 19 of chart 2, rib 3, p2tog, [rib 4, p2tog] twice, work to end—6 sts dec’d. Work 3 rows in pat.
Beg chart 4
Next (dec) row (RS) Rib to marker, sm, work row 23 of chart 1, p2tog, k1, p1, p2tog, rib 3, p2tog, k1tbl, M1, k1tbl for twist-st column, work row 1 of chart 4, p1, work row 23 of chart 2, p1, work row 1 of chart 4, k1tbl, M1, k1tbl for twist-st column, p2tog, rib 3, p2tog, rib 2, p2tog, k0, work row 23 of chart 3, rib to end—6 sts dec’d.
Work in pats for 3 rows more, working sts in twist-st column on WS as p1tbl, k1, p1tbl, and on RS row as k1tbl, k1, k1tbl.
Next (dec) row (RS) Rib to marker, sm, work row 27 of chart 1, p1, k1, p2tog, k2, p2tog, work twist-st column, work row 5 of chart 4, work row 27 of chart 2, work row 5 of chart 4, work twist-st column, p2tog, k2, p2tog, k1, p1, k2, work row 27 of chart 3, rib to end—4 sts dec’d.
Work in chart and rib pats as established until piece measures 16″/40.5cm from beg, end with a WS row—107 (113, 119, 131) sts.

Pattern #6, Empire Peplum Cardi

Photo on page 54, instructions begin on page 86.
Updated: 24Aug2015

1. Correction is underlined.

Beg increase segment chart
Row 1 (WS)
Rib 5 sts, place marker (pm), p1, [p11, pm] 9 (10, 10, 11) times, rib 5 sts.
Row 3 (WS) Rib 5 sts, sl marker, p1, [work row 3 of chart] 9 (10, 10, 11) times, rib 5.

2. The directions for the 2-st RC should read as follows:

K2tog and leave these 2 sts on LH needle, then k the first st again and sl both sts from needle.

3. Under Skirt, after row 17, work 1 row even in St st, then work 1 additional bobble row as foll:
Row 19 (RS) Rib 5 sts, *MB, k5; rep from * to last 6 sts, MB, rib 5 sts. Cont as written.

Pattern #7, Diamond Peplum Pullover

Photo on page 55, instructions begin on page 87.
Updated: 02Jul2013

Correction is underlined.

BACK
Armhole shaping

Bind off 3 (4, 5, 6, 9) sts at beg of next 2 rows.
Next (dec) row (RS) K3, ssk, knit to last 5 sts, k2tog, k3—80 (90, 100, 106, 112) sts.

Pattern #11, Cable Panel Dress

Photo on page 58, instructions begin on page 89.
Updated: 12Dec2012

Correction is underlined.

3-st LPC Sl 2 sts to cn and hold to front, p1, k2 from cn.

Pattern #15, Cape Pullover

Photo on page 62, instructions begin on page 93.
Updated: 27Mar2013

Correction is underlined.

Lower back trim

With circular needle and B, beg at lower marker, pick up and k 19 sts… cont as written.

Pattern #16, Cable Panel Poncho

Photo on page 63, instructions begin on page 94.
Updated: 15Feb2013

Corrections are underlined.

Lower edging
With RS facing, longer circular needle and CC, pick up and k 114 sts along lower edge of back.
Purl 1 row.
Row 1 (RS) Knit.
Row 2 (WS) Purl.
Row 3 (RS) Purl.
Row 4 (WS) Knit.
Row 5 (RS) Purl.
Rep rows 2–5 once more, then rep rows 2 and 3.
Bind off. Rep for lower edge of front. Sew side seams of edging.

Pattern #21, Textured Pullover

Photo on page 68, instructions begin on page 97.
Updated: 22Apr2013

The instructions for completing the right sleeve were inadvertently omitted.
After you decrease to 26 (28, 30) sts. Work even in St st for 3”/7.5cm. Bind off.

Pattern #22, Textured Cardigan

Photo on page 69, instructions begin on page 99.
Updated: 08Nov2013

1. Corrections to Charts 1 and 2 have been posted. [PDF 26KB]

2. Corrections are underlined.

Center Cable Panel
Row 5
Rep row 1.

Beg charts
Next row (RS)
K1…work to end of chart, k1.

Pattern #25, Socks

Photo on page 58, instructions begin on page 89.
Updated: 13Dec2012

Correction is underlined.

Rnd 11 (inc) * Rib 6 sts, LIR, LIL, p1, work to marker; rep from * once more—76 sts.

Pattern #26, Cabled Toque

Photo on page 71, instructions begin on page 102.
Updated: 02Jan2013

Correction is underlined.

5-st RC dec 1 Sl 2 sts to cn, hold to back, k2, k1 from cn, ssk 1 st from cn with next st—1 st dec’d.

Pattern #27, Cabled Helmet Hat

Photo on page 72, instructions begin on page 103.
Updated: 27Feb2015

1. For the earflap, the first inc row should read as foll:

Next (inc) row (RS) K2, M1, pm, k2, pm, M1, k2—8 sts.

2. Beg Cable Pat in Rows
Next row (WS)
K3, sm, work row 2 of cable pat in rows, sm, k3.

Pattern #28, Leg Warmers

Photo on page 73, instructions begin on page 103.
Updated: 31Jan2013

After casting on:
Next rnd *K2, p1; rep from * around.
Rep this rnd 9 times more for k2, p1 rib.

Beg foot and heel
Rnd 1
[K2, p1] twice, 4-st RC dec, [p4, 4-st RC dec] twice, p1, [k2, p1] twice, work chart pat, p1—48 sts.

Pattern #35, Cabled Cardigan

Photo on page 78, instructions begin on page 109.
Updated: 22Jan2013

A corrected chart has been published. [PDF 38KB]